Finishes
Finishes are what homeowners see and touch every day, so they are often where complaints arise. Clear tolerances and consistent workmanship make the difference at handover.
Independent revision notes, not a design specification. The public references below are for England; requirements differ across the UK. Use current local regulations, the approved project design and manufacturer instructions for decisions on site.
Plastering and drylining
Surfaces should be flat, with any deviation within accepted tolerances when measured with a straightedge. Plasterboard is fixed at the correct centres, joints taped and filled, and boards kept dry before fixing. Rooms should be left to dry out before decoration.
Internal joinery
Doors should hang square with even gaps, open and close without binding and be fitted with the correct ironmongery. Skirtings and architraves are fixed tightly with neat mitres. Fire doors need the correct frames, seals, closers and labels to work as tested.
Decoration and tiling
Paint should give even coverage without runs, misses or visible patching, judged in normal light from a reasonable viewing distance. Tiling should be on a suitable, flat background with consistent joints and fully bedded tiles in wet areas, finished with flexible sealant at junctions.
- Inspect in normal daylight, not raking torchlight.
- Sealant at baths, showers and worktop junctions.
- Floor finishes level and protected until handover.
Prepare the background before judging the finish
A finish depends on the surface underneath it. Check that plaster, screed and boards are suitable, sound and sufficiently dry for the specified coating or adhesive. Do not use decoration to disguise active dampness or an unresolved crack. Establish whether a defect is in the finish, the background or the underlying construction before selecting a repair; otherwise the same mark may return after handover.
Follow the product's preparation requirements for primers, curing and application conditions. Different backgrounds can need different treatment even within one room. Moisture checks should suit the substrate and finish, rather than relying only on whether a surface feels dry. Protect completed finishes from following trades while allowing the required drying and ventilation to continue.
Wet areas need more than neat tiling
Tiles and grout alone are not proof of a waterproof assembly. Where the design requires a waterproofing system, inspect it at corners, joints, outlets and penetrations before tiling. Use compatible boards, primers, adhesive and sealants. A flexible surface joint accommodates movement but does not replace a missing concealed waterproofing detail behind a shower or bath.
Check the tile background and the specified bedding method before work starts. Hollow areas, poorly supported edges or an unsuitable substrate can produce cracking or loose tiles later. Keep movement joints where the design requires them, including changes of plane and interfaces with other materials. Treat replacement tiles as part of the same system, with attention to any damage caused when removing the original.
Handover: appearance, function and safety
Use the agreed specification and inspection method for appearance checks; there is no single numerical tolerance covering every finish. Separate cosmetic observations from functional defects such as a binding door, loose guarding or leaking seal. Fire doors must retain the hardware, seals and gaps required by their tested assembly. Decoration or trimming must not compromise a safety-critical door to improve its appearance.
Keep a clear snagging record with the location, defect, agreed action and confirmation of the completed repair. Inspect in suitable normal conditions, but investigate evidence of water ingress or movement even when it is not prominent from a standard viewing position. Handover is also the point to explain maintenance, drying-out expectations and care instructions without dismissing genuine defects as routine settlement.
- Check substrate condition and product compatibility before finishing.
- Inspect concealed wet-area waterproofing before tiling.
- Check function and safety as well as appearance, and record completed repairs.
Quick site checklist
- Walls and ceilings within flatness tolerance
- Doors hung with even gaps
- Fire doors complete with seals and closers
- Paint even with no visible defects
- Wet-area tiling fully bedded and sealed
Worked revision questions
1. A damp patch is painted over and disappears. Has the underlying defect been resolved?
Answer: Not necessarily — establish and correct the moisture source.
A coating can hide a symptom without repairing a leak, moisture bridge or incomplete drying. Investigate the cause and prepare the background correctly before redecorating.
2. Does neat grout establish that a shower wall is waterproof?
Answer: No — check the specified complete wet-area system.
Water protection may depend on layers and sealed junctions concealed behind the tiles. Appearance at the surface does not confirm continuity around corners, outlets and service entries.
3. Can a fire door be trimmed until its gaps look even without checking its instructions?
Answer: No — preserve the permitted dimensions and tested assembly requirements.
Fire-door performance depends on the leaf, frame, gaps, seals and hardware together. A cosmetic adjustment must not exceed the permitted alteration or compromise that arrangement.
Further reading & source guidance