Revision guides
Plain-English notes on the eight main areas of new-home construction. Read a guide, then test yourself in Practice or the daily quiz.
Site preparation, materials and workmanship
Ground investigation, contamination, storing materials and the general standard of workmanship expected on every new home.
Foundations
Strip, trench-fill, raft and piled foundations, minimum depths, trees on shrinkable clay and difficult ground.
Substructure and ground floors
Damp-proof courses and membranes, ground-bearing slabs, suspended floors, void ventilation and gas protection.
Masonry superstructure
Cavity walls, wall ties, lintels, cavity trays, movement joints and weather resistance of brick and block walls.
Timber and light steel frame, floors and stairs
Frame erection, breather membranes, joist notching, separating floors and safe stair geometry.
Roofs
Trussed rafters and bracing, ventilation, tile and slate fixing, flat roofs and junctions.
Services
Drainage gradients and testing, rainwater, heating and hot water, electrics and sealing service penetrations.
Finishes
Plastering, drylining, joinery, decoration, tiling and the tolerances that decide whether a finish is acceptable.