Masonry superstructure
Most UK homes are built with cavity masonry walls. They perform well when the cavity is kept clean, the ties and lintels are right and water is directed back out of the wall at every opening.
Independent revision notes, not a design specification. The public references below are for England; requirements differ across the UK. Use current local regulations, the approved project design and manufacturer instructions for decisions on site.
Cavity walls and ties
The cavity stops rain that soaks through the outer leaf from reaching the inner leaf. Wall ties link the two leaves structurally and should slope slightly down towards the outer leaf so water cannot travel inwards. Ties are spaced more closely at openings and movement joints.
Mortar droppings on ties or at the base of the cavity create bridges that let damp across, so cavities should be kept clean as work proceeds.
Openings, lintels and cavity trays
Lintels must have adequate bearing at each end and be the type specified for the load. Above openings, cavity trays with stop ends and weep holes collect water in the cavity and drain it outside. Closers at reveals stop the cavity being bridged and help with air tightness and fire stopping.
Movement joints
Clay bricks expand over time and concrete blocks shrink, so long walls need movement joints at set intervals and at changes of height or thickness. Joints should be continuous, kept clear of mortar and sealed with a suitable flexible sealant.
Weather and workmanship
Joints should be fully filled and well tooled, and newly built walls protected from rain and frost. Bricks should be blended from several packs to avoid banding in colour.
- Insulation boards tight-butted and fixed against the inner leaf.
- Weep holes clear and correctly spaced.
- Stop ends fitted to cavity trays.
Inspect the cavity as the wall rises
Once the outer leaf is complete, many important checks become difficult. Inspect ties, insulation, cavity cleanliness and moisture details progressively. Confirm the specified tie type for the cavity width and exposure, the embedment into both leaves, and any additional ties at openings. Ties distorted to compensate for setting-out errors should be referred for an agreed remedy rather than concealed.
Check insulation against the approved wall build-up. Gaps, displaced boards and mortar trapped behind them can reduce the intended thermal performance. The required residual cavity depends on the chosen system and exposure; do not apply one generic dimension to every wall. Use the manufacturer's installation requirements together with the drawing, and keep the cavity base clear as work proceeds.
Openings are a moisture-management system
At a window or door, lintel support, cavity trays, stop ends, weep outlets and reveal details must work together. A tray without a usable exit can collect water rather than dispose of it. Check continuity at corners and joints, and verify that outlets are not blocked by mortar or later finishes. Match the lintel to the loading, span and wall arrangement shown in the design.
Junctions with roofs and other walls deserve the same attention as straightforward openings. A neat external finish cannot compensate for an absent concealed tray or incorrectly formed flashing. Before closing a junction, ask where penetrating water will go and whether the proposed route remains clear after subsequent work. Record unusual details and obtain clarification when drawings conflict.
Movement and stability during construction
Movement joints accommodate predicted changes in masonry; filling them with rigid mortar defeats their purpose. Check the specified location, width, backing and sealant, and confirm that finishes do not bridge the joint. Part-built walls also need stability precautions during construction. Do not assume a wall is secure simply because it will eventually be restrained by a roof or floor that is not yet installed.
- Inspect tie type, position and embedment before concealment.
- Trace water from cavity trays to clear external outlets.
- Keep movement joints free of rigid bridging and follow temporary stability requirements.
Quick site checklist
- Ties sloping outwards and at correct spacing
- Cavities and ties free of mortar droppings
- Cavity trays, stop ends and weeps at openings
- Movement joints at specified positions
- New work protected from weather
Worked revision questions
1. A cavity tray is fitted above a window, but the weep outlets are filled with mortar. What is the defect?
Answer: The collected water has no intended drainage route.
The tray and its outlets form one detail. Clear or reinstate the outlets using the specified arrangement and check stop ends and continuity; the presence of a tray alone is not sufficient.
2. Why is mortar left on a wall tie more than a housekeeping issue?
Answer: It can bridge the cavity and interfere with drainage or insulation.
The cavity separates the wet outer leaf from the inner construction. Mortar deposits can undermine that separation, so cleanliness is a performance check carried out as the wall rises.
3. Can a movement joint be filled with mortar to make the brickwork look continuous?
Answer: No — it must retain its designed movement capability.
A rigid bridge restrains the joint and can lead to cracking elsewhere. Use the specified flexible joint detail and ensure finishes do not reconnect the separated masonry.
Further reading & source guidance
These public references support the principles discussed here. The worked examples are independently written, not quotations or official compliance checks. Confirm the applicable edition and its scope before relying on any detail.